Manufacturing

Hard Chromium Plating Unit

This project involves setting up a hard chromium plating unit to provide industrial coating services. The process enhances the durability, wear resistance, and heat resistance of engineering components like cutting tools, dies, and piston rods.

Project cost & finance

Cost of Project

figures in ₹ Lakhs

Building & Civil Work4
Plant & Machinery9
Furniture & Fixtures2
Working Capital5.56
Total20.56

Means of Finance

figures in ₹ Lakhs

Own Contribution2.06
Term Loan13.5
Working Capital Loan5
Total20.56

Raw materials & machinery

Machinery & equipment8

Raw materials3

Manufacturing process

  1. Pre-clean steel parts in a hot alkaline soak cleaner and rinse thoroughly.
  2. Perform anodic etching in a chromic sulphuric bath for 1-2 minutes for proper adhesion.
  3. Transfer the parts to the plating bath for the hard chromium deposition process.
  4. Rinse the plated parts in a drag-out tank followed by water rinsing and hot water rinsing.
  5. Heat components of hardened steel to at least 200 degrees Celsius to eliminate hydrogen embrittlement.

From the project report